Verified Commercial Project • Nampa, Idaho

Commercial Sealcoating, Crack Filling, Asphalt Patching & Line Striping at Vision Bioenergy Oilseeds in Nampa, ID

Superior Striping completed a multi-service commercial parking lot maintenance and repair project for Vision Bioenergy Oilseeds in Nampa, Idaho. The scope of work included saw-cutting and replacing two failed asphalt sections (10 × 10 ft. and 20 × 20 ft.), cleaning and filling parking lot cracks with hot-applied rubber, applying two coats of asphalt sealer across approximately 66,413 sq. ft., and restriping the parking lot to match the existing layout.

66,413 sq. ft. Sealcoating (2 Coats) Hot Rubber Crack Filling Saw-Cut Asphalt Patching (500 sq. ft.) Parking Lot Line Striping
Location: Nampa, Idaho (Canyon County)
Client Facility: Vision Bioenergy Oilseeds
Superior Striping crew member prepping and filling asphalt cracks on the commercial parking lot at Vision Bioenergy Oilseeds in Nampa, Idaho.
Superior Striping crew member cleaning, prepping, and sealing asphalt cracks on the commercial parking lot at Vision Bioenergy Oilseeds in Nampa, ID.
Sealcoating Area
~66,413 ft.²
Cleaned, prepped & sealed (2 coats)
Saw-Cut Asphalt Patching
2 Areas (500 ft.²)
10 × 10 ft. and 20 × 20 ft. sections
Crack Sealing & Striping
Hot Rubber + Restripe
Full lot crack fill & layout match
Itemized Line-Item Total
$23,418
Across 4 documented service items

Project Overview: Vision Bioenergy Oilseeds in Nampa, Idaho

Commercial and industrial properties in Nampa, Idaho require coordinated pavement maintenance when surface wear includes both localized structural failures and widespread weathering. At the Vision Bioenergy Oilseeds facility in Nampa, Superior Striping executed a four-part commercial asphalt maintenance scope covering full-depth patch replacement, hot-applied rubber crack filling, two-coat asphalt sealcoating, and parking lot restriping.

Service Category Verified Scope & Technical Specification Documented Line Item
Asphalt Sealcoating Clean, prep, and sealcoat approximately 66,413 ft.² of asphalt with two coats of sealer. $16,603
Hot Rubber Crack Filling Clean, prep, and fill cracks in the parking lot with hot rubber. $3,320
Saw-Cut Asphalt Patching Saw cut and remove two areas measuring 10 × 10 ft. (100 ft.²) and 20 × 20 ft. (400 ft.²). Prep, replace with new asphalt, and compact with a double drum roller. $2,500
Parking Lot Line Striping Stripe the parking lot to match the existing pavement marking layout. $995
Sum of Itemized Project Services $23,418
Project Billing & Deposit Note: Per the project documentation, half down was received upfront as a security deposit and for materials, with the remaining balance due upon completion (the source invoice header also carries a truncated $11,70 balance notation consistent with half of the $23,418 itemized total).

Scope of Work Performed

Superior Striping sequenced the work at Vision Bioenergy Oilseeds so that structural asphalt repairs and crack sealing were completed prior to surface sealcoating and final line striping.

1. Saw-Cut Asphalt Patching & Double Drum Roller Compaction

Documented Scope: $2,500

Before surface treatments were applied, the crew addressed two localized areas of damaged pavement measuring 10 × 10 ft. (100 sq. ft.) and 20 × 20 ft. (400 sq. ft.), totaling 500 sq. ft. of full-removal asphalt patching in Nampa, ID:

  • Saw Cutting & Removal: Both the 10 × 10 ft. and 20 × 20 ft. sections were saw-cut to create clean, vertical perimeter edges, and the deteriorated asphalt material was removed.
  • Base Preparation & Hot-Mix Replacement: The exposed patch areas were prepped and filled with new asphalt.
  • Compaction: The new asphalt patches were compacted using a double drum roller to create a dense, level surface transition with the surrounding parking lot.

Learn more about our commercial and residential asphalt patching services and what affects asphalt patching cost in Nampa, ID.

2. Cleaning, Preparation & Hot Rubber Crack Filling

Documented Scope: $3,320

Open cracks across the parking lot allow moisture to penetrate the sub-base, which accelerates pavement deterioration during Treasure Valley freeze-thaw cycles. Superior Striping performed comprehensive hot rubber crack filling across the facility lot:

  • Crack Cleaning & Preparation: Existing cracks across the parking lot were cleaned and prepped so the sealant could bond directly to the asphalt walls.
  • Hot-Applied Rubber Application: Using commercial hot-pour melter applicator equipment, the crew filled the prepared cracks with hot rubber sealant to seal out water along the drive lanes, stalls, and concrete curb transitions.

3. Two-Coat Commercial Asphalt Sealcoating (66,413 ft.²)

Documented Scope: $16,603

Following the patching and crack sealing stages, Superior Striping completed sealcoating in Nampa, Idaho across approximately 66,413 sq. ft. of commercial asphalt pavement:

  • Surface Cleaning & Joint Prep: The 66,413 sq. ft. lot was cleaned and prepped, including squeegee application of bonding primer along pavement transition joints and concrete aprons.
  • Two-Coat Sealer Application: The crew applied two coats of asphalt sealer across the entire 66,413 sq. ft. area, working the sealer carefully by squeegee along concrete joints, curb lines, and parking stalls for uniform coverage.

Explore our Treasure Valley sealcoating services for parking lots and driveways.

4. Parking Lot Line Striping to Match Existing Layout

Documented Scope: $995

Once the two coats of asphalt sealer cured, Superior Striping completed parking lot line striping in Nampa to restore clear stall organization and traffic markings:

  • Layout Restriping: The parking lot was striped to match the existing layout, re-establishing visible stall lines and pavement markings over the newly sealed blacktop.

View full details on our commercial parking lot line striping services.

Project Results & Completed Deliverables

Through this coordinated maintenance scope at Vision Bioenergy Oilseeds in Nampa, Superior Striping completed all four contracted stages of pavement repair, surface protection, and lot marking:

  • 500 sq. ft. of Full-Depth Asphalt Patching Completed: Two deteriorated pavement sections (10 × 10 ft. and 20 × 20 ft.) were saw-cut, excavated, prepped, replaced with fresh asphalt, and compacted with a double drum roller.
  • Hot Rubber Crack Sealing Across the Facility Lot: Cracks throughout the parking area and along concrete curb edges were cleaned, prepped, and sealed with hot-applied rubber using walk-behind melter applicator equipment.
  • Approximately 66,413 sq. ft. Protected with Two Coats of Sealer: The commercial asphalt lot was cleaned, primed along transition joints, and coated with two applications of asphalt sealer, including detailed hand-squeegee work along concrete joints.
  • Parking Lot Restriped to Match Existing Layout: Fresh traffic markings were applied over the cured sealcoat to match the facility's existing parking configuration.

Request an Estimate for Commercial Asphalt Maintenance in Nampa, ID

Whether your facility requires two-coat asphalt sealcoating, hot rubber crack filling, saw-cut asphalt patching, or parking lot line striping, Superior Striping handles all four services across Nampa and the Treasure Valley.

Areas we serve

Business Hours

Monday – Friday: 8 AM – 8 PM
Saturday: 8 AM – 12 PM
Sunday: Closed

Follow Us

Newsletter

You have been successfully Subscribed! Ops! Something went wrong, please try again.

Copyright © By Globalbridge360