Commercial Saw-Cut Asphalt Patching & Sunken Parking Lot Repair at a Maverik Gas Station in Boise, ID
Superior Striping completed a structural asphalt patching project to repair a sunken parking lot area at a Maverik gas station in Boise, Idaho. Rather than applying a temporary surface skin patch over settled pavement, our crew saw-cut and removed the damaged asphalt, rebuilt and compacted the aggregate base, paved the excavation with new hot-mix asphalt, and compacted the patch using a double drum roller.
Project Overview: Maverik Gas Station in Boise, Idaho
High-traffic commercial fuel stations and convenience stores in Boise, Idaho experience continuous wheel loads from passenger vehicles, pickup trucks, and delivery traffic. When a localized section of pavement settles or sinks, water pools in the depression and infiltrates the underlying sub-base, accelerating structural failure around the sunken area.
At this Boise Maverik gas station, Superior Striping was contracted to repair a sunken area in the commercial parking lot along the concrete curb line. To address both the surface depression and the underlying base support, our crew executed a four-stage asphalt patching in Boise, Idaho scope: saw-cutting and removing the failed asphalt, preparing and compacting the aggregate base, paving the patch with new asphalt, and compacting the surface with a double drum roller.
| Repair Stage | Verified Scope & Technical Specification | Equipment / Method |
|---|---|---|
| 1. Sunken Area Assessment & Saw Cutting | Isolate the sunken area in the parking lot and saw-cut clean, straight vertical perimeter edges around the damaged pavement section. | Full-Depth Saw Cut |
| 2. Asphalt Demolition & Debris Removal | Break up and excavate the damaged asphalt material down to the underlying base layer. | Skid Steer & Hand Excavation |
| 3. Aggregate Base Preparation & Packing | Deliver, grade, and pack aggregate base material inside the rectangular cut to restore stable, level sub-base support. | Tracked Skid Steer & Compactor |
| 4. New Asphalt Paving & Compaction | Pave the prepared excavation with new hot-mix asphalt and compact flush with the surrounding lot and curb using a double drum roller. | Double Drum Vibratory Roller |
| Completed Commercial Deliverable | Full-Depth Structural Asphalt Patch | |
Scope of Work Performed
Superior Striping performed a full-depth removal and replacement process so the repaired section at the Boise Maverik gas station would rest on a compacted aggregate foundation rather than bridging over settled soil or broken asphalt.
1. Saw-Cutting & Removing the Damaged Sunken Asphalt
Stage 1: Demolition & RemovalRepairing a sunken parking lot section requires removing the compromised asphalt rather than layering new material over a failing base. Our crew began the commercial asphalt patching process by marking out a clean rectangular perimeter encompassing the sunken area adjacent to the concrete curb:
- Full-Depth Perimeter Saw Cutting: The perimeter of the damaged area was saw-cut to create straight, vertical asphalt edges. Clean vertical cuts allow the new hot-mix asphalt to key into sound surrounding pavement without feathered edges that can ravel under vehicle tires.
- Excavation & Debris Clearing: Crew members excavated the broken, settled asphalt slabs and cleared loose debris from the trench using a tracked skid steer loader and hand shovels.
2. Aggregate Base Preparation, Grading & Packing
Stage 2: Structural Sub-Base PrepSunken areas in commercial parking lots typically occur when the underlying aggregate base shifts, washes out, or settles under repeated traffic loads. Once the old asphalt was removed, Superior Striping rebuilt the foundation inside the excavated patch:
- Aggregate Base Delivery: Using a tracked skid steer under the Maverik station canopy and lot area, the crew transported granular aggregate base material directly to the excavation site.
- Grading & Compaction: Crew members leveled the aggregate base across the rectangular cut and packed the base material firmly so it achieved a uniform elevation prior to paving.
Learn why sub-base preparation is critical in our guide on how long an asphalt patch lasts in the Treasure Valley.
3. Hot-Mix Asphalt Paving & Double Drum Roller Compaction
Stage 3: Paving & CompactionWith the aggregate base graded and packed, Superior Striping completed the Boise asphalt patching installation and surface compaction:
- Paving with New Asphalt: Fresh hot-mix asphalt was placed into the rectangular saw-cut excavation and raked evenly across the patch footprint up to the concrete curb line and surrounding asphalt edges.
- Double Drum Roller Compaction: A Superior Striping operator compacted the new asphalt using a ride-on double drum vibratory roller, compressing the hot-mix mat to create a dense, level surface transition with the existing parking lot pavement.
- Perimeter Safety Barricading: Upon completion of rolling, the newly paved patch was cordoned off with high-visibility orange traffic cones while the asphalt cooled and cured.
Coordinate full-lot repairs for retail and fuel properties through our commercial asphalt maintenance services in the Treasure Valley.
Project Gallery: Maverik Gas Station Asphalt Patching in Boise, ID
The photographs below document Superior Striping on-site at the Boise, Idaho Maverik gas station during aggregate base transport, trench excavation, base preparation, double drum roller compaction, and final patch completion.
Project Results & Completed Deliverables
By completing a full-depth saw-cut patch rather than a surface overlay, Superior Striping delivered the following verifiable work at the Boise Maverik gas station parking lot:
- Sunken Parking Lot Area Eliminated: The settled, damaged asphalt section along the concrete curb was isolated, saw-cut with clean rectangular edges, and excavated.
- Rebuilt & Packed Aggregate Sub-Base: Granular base material was hauled in by skid steer, graded level across the rectangular trench, and mechanically packed to support commercial vehicle traffic.
- Fresh Hot-Mix Asphalt Paved & Compacted Flush: New asphalt was placed into the prepared cut and compacted with a double drum roller to create an even, flush transition with the adjacent concrete curb and existing asphalt lot.
Related Boise & Treasure Valley Asphalt Services
Managing a commercial parking lot, fuel station, or retail facility in Boise or the Treasure Valley? Explore Superior Striping's related service pages and recent project case studies:
Asphalt Patching Services in Boise, Idaho
Saw-cut removal, aggregate base preparation, hot-mix asphalt paving, and roller compaction for sunken areas and potholes in Boise.
View Boise Asphalt Patching → Treasure Valley ServiceCommercial & Residential Asphalt Patching
Full-depth structural asphalt patching and pavement repair across Boise, Meridian, Nampa, Caldwell, Eagle, Kuna, and Star.
Explore Asphalt Patching → Boise, ID ServiceSealcoating Services in Boise, Idaho
Protective asphalt sealcoating for commercial parking lots and residential driveways throughout Boise and Ada County.
View Boise Sealcoating → Boise, ID ServiceParking Lot Line Striping in Boise, ID
Precision stall markings, directional arrows, fire lanes, and ADA-compliant parking lot striping for Boise businesses.
View Boise Line Striping → For Property ManagersCommercial Asphalt Maintenance in Treasure Valley
Coordinated asphalt patching, crack filling, sealcoating, bollards, signage, and lot striping for commercial properties.
Explore Commercial Maintenance → Related Case StudyVision Bioenergy Oilseeds Case Study (Nampa, ID)
See how Superior Striping completed 500 sq. ft. of saw-cut asphalt patching, hot rubber crack filling, and 66,413 sq. ft. of sealcoating.
Read Nampa Case Study →Request an Estimate for Commercial Asphalt Patching in Boise, ID
If your commercial parking lot in Boise or the Treasure Valley has sunken pavement sections, potholes, or alligator cracking, Superior Striping performs full-depth saw-cut removal, aggregate base preparation, hot-mix asphalt paving, and double drum roller compaction.